Quang Nam: Inauguration of the second transit house in the province

598 Viewed
06/12/2022
Minh Trần
0

On the morning of 6/12, the Action to the Community Development Institute (ACDC), in collaboration with the Project Management Board "Raising voices, creating opportunities, phase II" in Quang Nam province, organized the inauguration ceremony of the second transit house in the province. The activity is funded by the United States Agency for International Development (USAID).

Attending the inauguration ceremony were Ms. Le Thi Thuy Huong, USAID Vietnam representative; Ms. Nguyen Thi Lan Anh, Director of ACDC Institute; Ms. Doan Thi Hoai Nhi, Deputy Director of the Provincial Department of Labor, War Invalids and Social Affairs, Head of the Project Management Board; Mr. Duong Ngoc Vinh, Deputy Director of provincial Department of Health; Mr. Duong Duc Lin, Vice Chairman of Tien Phuoc District People's Committee; Mr. Hua Quoc Dung, Chairman of the Provincial Association of Persons with disabilities; In addition, the event was attended by a large number of representatives of district departments, officials of health centers and persons with disabilities, patients in the district, and press agencies.

This is the second project in the province after the Transit House at Thang Binh District Medical Center and the fifth transit house in the country according to this model. The house was surveyed, conceptualized and designed from 4/2022 and started to construct in 8/2022. The process of surveying, evaluating, selecting and perfecting the transit house model has been carried out through consultations and exchanges with professional specialist agency and independent experts. The highest goal is to ensure that the transit house fully meets the medical requirements and construction technical requirements, helping patients to have maximum and effective access.

Ms. Nguyen Thi Lan Anh, Director of ACDC Institute, said: "The transit house has been applied by us first in Thua Thien Hue province since 2019 and has brought positive effects. In Quang Nam, this is the second model of transit house built in the province, after the transit house at Thang Binh District Medical Center inaugurated in June 2020. We hope that the model will effectively support patients and persons with disabilities in rehabilitation. At the same time, this will also be a model for persons with disabilities or their families to refer and study to change the living environment more suitable for persons with disabilities."

At the inauguration ceremony, Mr. Tran Van Dung, Director of Tien Phuoc District Medical Center shared: "In the coming time, the Medical Center will develop a plan to promote rehabilitation, especially community-based rehabilitation; strengthening the prevention of disabilities, early detection, and improving the quality of life of persons with disabilities.  Thereby, helping persons with disabilities to access health and public services, be able to participate in social activities equally, maximize the capacity of persons with disabilities."  

The transit house model has been built and applied in many developed countries around the world. This is a model that gives patients and persons with disabilities the opportunity to practice daily living functions before returning to their families and communities, to reinclude independently. Activities performed in the transit house focus on mastering basic living functions that have previously been rehabilitated such as: movement, self-dressing, eating, cooking, personal hygiene, and other community engagement activities. 

The transfer house includes 5 areas: common movement area, kitchen and dining, toilet, bedroom and area for daily activities such as living room, recreation and training. The building is also equipped with small items for patients to take care of themselves and practice daily activities such as kitchen utensils (tableware, toiletries, fabrics), equipment to support movement (wheelchairs), navigation devices (shower seats).

There have been 5 transit houses nationwide inaugurated and put into use. Hopefully, this model will continue to be replicated in the future with the positive effects that the model brings.

Translator: Hoang Duc

0/5
(0 nhận xét)
5
0%
4
0%
3
0%
2
0%
1
0%

Đánh giá cả bạn về Quang Nam: Inauguration of the second transit house in the province

Related news

Gia Lai and Quang Ngai: Continuing the disbursement of over 200 million vnd in livelihood support for persons with disabilities
Nhung Trần
74 13/07/2026

Gia Lai and Quang Ngai: Continuing the disbursement of over 200 million vnd in livelihood support for persons with disabilities

As part of a series of livelihood support activities for persons with disabilities, from 7–13 July 2026, the Action to the Community Development Institute (ACDC), in collaboration with the Gia Lai Provincial Department of Health and the Quang Ngai Provincial Department of Health, with technical support from livelihood specialists and local agricultural extension officers, conducted mid-term assessments and the second round of livelihood grant disbursements for 62 households of persons with disabilities across the two provinces. During this phase, the project provided more than 200 million VND, bringing the total investment in livelihood models for persons with disabilities to over 800 million VND.
Quang Tri: Implementing a series of home-based rehabilitation interventions and assessment, prescription of assistive products for persons with disabilities
Bùi Thạch
146 01/07/2026

Quang Tri: Implementing a series of home-based rehabilitation interventions and assessment, prescription of assistive products for persons with disabilities

In June 2026, the Action to the Community Development Institute (ACDC), in collaboration with the Quang Tri Provincial Department of Health, organized the activity “Home-based Rehabilitation Intervention (First Round) and Assessment of Needs and Prescription of Assistive Products for Persons with Disabilities.” The activity was conducted in two phases, from 12–16 June and 19–23 June 2026, across 13 communes and wards in Quang Tri Province.
U.S. Embassy and NACCET delegation visits inclusion 2B project implementation sites
Minh Tâm
209 26/06/2026

U.S. Embassy and NACCET delegation visits inclusion 2B project implementation sites

From 22 – 24 June 2026, a delegation from the U.S. Embassy in Vietnam and the National Action Center for Toxic Chemicals and Environmental Treatment (NACCET) conducted a regular monitoring visit to the Inclusion 2B Project in Quang Ngai Province. The visit was organized within the framework of the project funded by the U.S. Government through the U.S. Department of State in Vietnam.